Home> Products> Bored Secant Pile Drilling Rig> Construction of the occluding pile
Construction of the occluding pile

Construction of the occluding pile

Payment Type: T/T

Transportation: Ocean

Product Attributes
Product Attributes

Model No.JSP170H

BrandXuzhou JingAn Heavy Industry manufacture CO.,Ltd

Applicable IndustryManufacturing Plant, Construction Works, Energy &Amp; Mining

Video Factory InspectionProvided

Mechanical Test ReportProvided

Marketing TypeNew Product 2020

Core Component Warranty Period1 Year

Core ComponentsPlc, Engine, Bearing, Motor, Gear, Pump

StatusUsed

Place Of OriginChina

Warranty Period1 Year

Unique Selling PointLow Fuel Consumption

Packaging & Delivery
Selling Units : Set/Sets
Picture Example :
Product Description
The scheme of the full rotary Drilling Equipment,Casing Rotator, in the construction of the occluding pile is as follows:

 Geological investigation: Before construction, it is necessary to carry out geological investigation, understand the geological conditions, and determine the geological characteristics and underground conditions of the construction area in order to select the appropriate drilling location and construction plan.

 Drilling design: According to the geological investigation results and design requirements, determine the location, depth and diameter of the drilling, design the drilling scheme, including the drilling construction sequence, aperture, hole depth and other parameters.

 Drilling construction: The use of full rotary drilling rig for drilling construction, according to the design requirements to gradually complete the drilling, to ensure that the aperture and hole depth meet the requirements, and to ensure the perpendicularity and levelness of the drilling.

Steel bar installation: After drilling, it is necessary to install the steel bar, place the steel bar into the drilling hole according to the design requirements, and fix it to enhance the bearing capacity of the occlusal pile.

 Grouting grouting: After the reinforcement is installed, grouting is carried out and concrete is injected into the borehole to form the main structure of the occluding pile and ensure the stability and bearing capacity of the occluding pile.

 Follow-up treatment: After the construction of the occlusal pile is completed, follow-up treatment shall be carried out, including cleaning the construction site, checking the quality and stability of the occlusal pile, etc., to ensure the construction quality and safety.


JAR
Supply Ability & Additional Information

TransportationOcean

PortShanghai Port ,Qingdao Port

Payment TypeT/T

IncotermFOB,CIF

Other information
Casing rotator drilling machine 03

Hot Products

SEND INQUIRY

* 此处显示错误信息
* 此处显示错误信息
Send Inquiry
*
*

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send