Home> Products> Large Diameter Drilling Machine> Full rotary construction old pile removal
Full rotary construction old pile removal

Full rotary construction old pile removal

Payment Type: L/C,T/T

Transportation: Ocean

Product Attributes
Product Attributes

Model No.JAR320H

BrandXuzhou JIngAn Heavy Industry Manufacture CO.,Ltd

Applicable IndustryManufacturing Plant, Construction Works, Energy &Amp; Mining

Video Factory InspectionProvided

Mechanical Test ReportProvided

Marketing TypeNew Product 2020

Core Component Warranty Period1 Year

Core ComponentsPlc, Engine, Bearing, Motor, Gear, Pump

StatusUsed

Place Of OriginChina

Warranty Period1 Year

Unique Selling PointHigh Power Engine

Packaging & Delivery
Selling Units : Set/Sets
Picture Example :
Product Description

Full Revolving Drilling Rig is a high torque Casing Rotator ,used in old pile removal ,refers to the process of using full rotary excavator to carry out construction and pull out the old pile from the ground

 The full rotary excavator has the function of 360 degrees rotation, which can flexibly operate and control the action of the excavator, and improve the construction efficiency and accuracy.


The steps of removing old piles for full rotary construction are as follows:

 Determine the location and number of old piles to be removed, clean up the surrounding obstacles, and ensure the safety of the construction area.

 Install the full rotary excavator to the construction site to ensure the stability and safety of the excavator.

 Use the excavator's bucket or other appropriate tools to dig the soil and gravel out from around the old pile and expose the old part of the pile.

 Fix a wire rope or chain above the old pile to ensure the stability of the old pile during the removal process.

 Use the rotary function of the full rotary excavator to pull out the old pile from the ground. Old piles can be removed by lifting them upward, shaking them, or applying rotational forces.

 After removing the old piles, clean up the construction site, clean up the excavated soil and gravel, and ensure that the construction site is clean and tidy.

JAR
Supply Ability & Additional Information

TransportationOcean

PortShanghai Port ,Qingdao Port

Payment TypeL/C,T/T

IncotermFOB,CIF

Other information
Casing rotator drilling machine 02

Hot Products

SEND INQUIRY

* 此处显示错误信息
* 此处显示错误信息
Send Inquiry
*
*

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send